HCP is an abandoned mine site that has been severely impacted by past deep and surface mining practices containing over 277 acres of un-reclaimed abandoned mine pits and spoil piles. Portions of the site (approximately 50 acres) were subsequently used for disposal of municipal and industrial waste in several mine pits.

The site is a brownfield site and is Designated Special Industrial Area (SIA) by the Governor of Pennsylvania giving the site priority attention for remediation. HCP is authorized to conduct the site reclamation/remediation using the residual materials approved under WMGR085, WMGR096, and WMGR125.

Site Location /
Description

The Hazelton Reclamation site is a 277 acre property located within the City of Hazleton, Luzerne County Pennsylvania.  The location is in northeast Pennsylvania directly off Interstate 81 and bounded by Routes 924 Route 309 and Broad Street.

The site is an abandoned mine site that has been severely impacted by past deep and surface mining practices containing 277 acres of un-reclaimed abandoned mine pits and spoil piles.  Portions of the site (approximately 50 acres) were subsequently used for disposal of municipal and industrial waste in several mine pits.

The site is a brownfield site and is a designated Special Industrial Area under the PA Act 2 and has been designated a Brownfield Action Team site (BAT) by the Governor of Pennsylvania giving the site priority attention for remediation.  HCP is authorized to conduct the site reclamation /  remediation using the residual materials approved under WMGR085, WMGRO96, and WMGR125.

The Hazleton Reclamation Project site has the capacity to accept over 10 million cubic yards of residual materials to complete the site reclamation.

In order for HCP to determine whether your material is acceptable for beneficial use at the Hazleton Reclamation Project site, please complete the attached forms and provide HCP with the necessary information regarding the nature of the residual material, generation site, generator and due diligence performed.
For More Information on the Site or to discuss contractual terms, please see our Contact Page

Environmental
Quality

HCP is committed to the continual improvement of its management and operations, providing a quality service and minimizing any adverse effects on the environment and public health. We recognize the contribution we make to Sustainable Resource Management and will incorporate sustainable development thinking into all our activities.

Risk Management

Our recognition and acceptance of these responsibilities will be demonstrated by our commitment to:

  • Protecting surrounding environments and preserving natural resources.
  • Reducing environmental nuisance and preventing pollution risk related to our activities.
  • Complying with our regulatory, legislative, contractual or other obligations, and anticipating them whenever possible.
  • Striving for outstanding health and safety performance in the workplace.
  • Identifying and limiting industrial and environmental on-site risks.
  • Implementing actions aimed at improving the life of local communities.

Site Capacity
& Goals:

Our site has the capacity to accept over 10 million cubic yards of residual materials to complete the site reclamation. Permitted site for the beneficial use of the following:

**Please Note** All materials must meet Permit Requirements.

 

Hazelton Creek Properties

  • Dredge Material
  • Coal Ash
  • Cement Kiln Dust
  • Lime Kiln Dust
  • Regulated Fill Materials
  • PA Clean Fill Materials
  • Concrete, Brick, Block, Asphalt
  • Drill Cuttings

One of HCP’s goals, once the reclamation is complete, is to create the “Hazleton Performing Arts Center.” This allows the community of Hazleton to utilize previously unusable space in a centrally located area.